HCTRA_South Belt Segment 4

South Belt Segment 4

July 22, 2019 7:02 pm Published by

A project spanning close to two miles of roadway, we were responsible for producing roadway plans for Section 4 of the Sam Houston Tollway Southeast. We provided geometric design, section design with separate plans for...

tomball-toll-utility-coordination-sue

Tomball Tollway (Phase II)

July 22, 2019 3:30 pm Published by

From FM 2920 to Montgomery County Line, we coordinated utilities for the second phase of the Tomball Tollway with Level D-A Subsurface Utility Engineering (SUE). The project scope included creation and development of contact lists,...

sh-tollway-east-belt-widening-utility-coordination-booth

Sam Houston Tollway East Belt

July 22, 2019 2:56 pm Published by

A 12-mile-long project that involved utility coordination and level D-A SUE, it began with records research (SUE Level D), field investigations (SUE Level C) and coordination efforts with all identified utilities within the area. We...